Details
More Products & Services
Products & Services
Shephard Plus Update
Shephard Media
Shephard Plus is updating in June 2018 with rich new capabilities, and is now one of the most cost-effective and valuable aerospace and defence market intell...
Defence Insight
Shephard Media
Some of the things people like you use Defence Insight for:
- Total addressable market sizing ($)
- Competitor analysis
- Cost analysis
- Market forecasting
- Growth identification
- Increasing closing ratio
- Increasing closing order value
- Estimating product potential
- Calculating sales forecasting
- Supply and demand analysis
- Total addressable market sizing ($)
- Competitor analysis
- Cost analysis
- Market forecasting
- Growth identification
- Increasing closing ratio
- Increasing closing order value
- Estimating product potential
- Calculating sales forecasting
- Supply and demand analysis
Military Unmanned Systems Handbook
Shephard Media
The Military Unmanned Systems Handbook (Digital Download) is an international guide to the military UV industry and provides detailed information on air, ground and sea (surface & sub-sea) vehicles as well as subsystems. What's included: Unencrypted 390+ page PDF of equipment and supplier information Market summary
Description
The Defense Acquisition Program Administration (DAPA) in South Korea gave the green light in January for the development of new mine countermeasures vessels (MCMV), a type to be known as MSH-II.
The project has been allocated funding of KRW1.78 trillion ($1.42 billion), with Kangnam as the prime contractor for these boats that will displace somewhere between 500t and 700t.
The basic design of the MSH-IIs will be completed by 2025, with the first unit to be delivered to the Republic of Korea Navy (ROKN) in 2029. Six boats are likely.
These MCMVs will allow the retirement of six Ganggyeong-class minehunters and
The project has been allocated funding of KRW1.78 trillion ($1.42 billion), with Kangnam as the prime contractor for these boats that will displace somewhere between 500t and 700t.
The basic design of the MSH-IIs will be completed by 2025, with the first unit to be delivered to the Republic of Korea Navy (ROKN) in 2029. Six boats are likely.
These MCMVs will allow the retirement of six Ganggyeong-class minehunters and

Share
Recent Chats
Share via email
Future: handle WhatsApp here
Future: handle LinkedIn here
Future: handle Twitter here
SUBMENU HERE
Share via Chat
Copy Link