Standard Lift-Off Rest designation: 5LOR4.
Photo shows a 5LOR4, designed and manufactured to suit a 5" wide beam and 4" pipe.
Description
More Products & Services
Products & Services
Pipe support surveying
“Lift-off” Pipe Supports
Whether it is on or offshore. We photograph, compile and perform costing to ensure that you project is scoped accurately.
Our designers will design any pipe supports that require this service.
Lift-Off Rest (LOR) and Guide (LOG) combination.
“Lift-off” Pipe Supports
The pipe is a SS 304l material, resting on galvanized steel supports. The guides were scraping grooves into the pipe. We designed and manufactured the bottom rests as well as guides to solve the damage caused by the scrapping guides.
4LORP8
“Lift-off” Pipe Supports
This pipe support was designed to mitigate pipe support corrosion between the support pipe and the 12" process line.
The project consisted of approximately 1500 pipe supports, needing surveying, designing and subsequent costing.
The material of construction is a fiberglass composite which has a UV stabilized agent to safeguard against UV damage.
People
Description
The 5LOR4 as shown is supporting a 4" line. Suitable for 10,000lbs safe carrying capacity and 450deg F.
Material is Fiber glass composite with UV stabilized resin.
The project was installed in about 15minutes, due to the ease of installation, as no screws, epoxies or other means of fastening is required.
Material is Fiber glass composite with UV stabilized resin.
The project was installed in about 15minutes, due to the ease of installation, as no screws, epoxies or other means of fastening is required.