Details
More Products & Services
Products & Services
Defence Insight
Shephard Media
Some of the things people like you use Defence Insight for:
- Total addressable market sizing ($)
- Competitor analysis
- Cost analysis
- Market forecasting
- Growth identification
- Increasing closing ratio
- Increasing closing order value
- Estimating product potential
- Calculating sales forecasting
- Supply and demand analysis
- Total addressable market sizing ($)
- Competitor analysis
- Cost analysis
- Market forecasting
- Growth identification
- Increasing closing ratio
- Increasing closing order value
- Estimating product potential
- Calculating sales forecasting
- Supply and demand analysis
Military Unmanned Systems Handbook
Shephard Media
The Military Unmanned Systems Handbook (Digital Download) is an international guide to the military UV industry and provides detailed information on air, ground and sea (surface & sub-sea) vehicles as well as subsystems. What's included: Unencrypted 390+ page PDF of equipment and supplier information Market summary
Shephard Plus Update
Shephard Media
Shephard Plus is updating in June 2018 with rich new capabilities, and is now one of the most cost-effective and valuable aerospace and defence market intell...
Description
US secretary of the Navy Carlos Del Torohas announced plans to operate 12 of its Arleigh Burke-class (DDG 51) Flight I Destroyers beyond their 35-year expected service life. That equates to more than half of the 21-strong Flight I cohort.
The decision, which the Department said was “based on a hull-by-hull evaluation of ship material condition, combat capability, technical feasibility and lifecycle maintenance requirements”, will theoretically mean an additional 48 ship-years of cumulative ship service life between 2028 and 2035.
The Navy has also proposed funding for the DDG service life extension in the FY26 budget request and will update its shipbuilding plan accordingly.
Related Articles
US Navy Approves Service Life Extension for 4 Arleigh-Burke Class Destroyers
Last of the Flight IIA variant Arleigh Burke-class destroyers christened
“Extending these highly-capable, well-maintained destroyers will further bolster our numbers as new construction warships join the Fleet,” said secretary Del Toro. “It also speaks to their enduring role in projecting power globally, and most recently in the Red Sea, their proven ability to defend themselves, as well as our allies, partners and friends from missile and drone attacks.”
Each of the DDG-51 Flight I ships (DDG 51-71), which first entered service between 1991 and 1997, underwent a Navy inspection within the last 10 months. The 12 destroyers chosen for service extension were judged viable beyond their expected service life, though the Navy added that “the final determination of each ship's service life was based on maximizing the service life of each ship before it required another extensive and costly docking availability”.
Admiral Lisa Franchetti, chief of naval operations, said the life extension was in line with her NAVPLAN which directs the Navy to “get more ready players on the field”.
“Today's budget-constrained environment requires the Navy to make prioritised investments to keep more ready players on the field,” Franchetti explained. “The Navy is actively pulling the right levers to maintain and grow its Battle Force Inventory to support the US's global interests in peace and to win decisively in conflict.”
The Navy has not specified which 12 of the 21 Flight I Arleigh Burke-class vessels will have their operational life extended, nor whether there are any plans to similarly sweat the Flight II and IIA vessels in the class. Design and construction of vessels in Flight III of the class began in 2018, with more ordered in both 2019 and 2023. In 2023, however, it approved life extensions for four initial vesselsin the Flight Iclass.
Related Equipment in Defence Insight
Arleigh Burke Class (Flight I)
The decision, which the Department said was “based on a hull-by-hull evaluation of ship material condition, combat capability, technical feasibility and lifecycle maintenance requirements”, will theoretically mean an additional 48 ship-years of cumulative ship service life between 2028 and 2035.
The Navy has also proposed funding for the DDG service life extension in the FY26 budget request and will update its shipbuilding plan accordingly.
Related Articles
US Navy Approves Service Life Extension for 4 Arleigh-Burke Class Destroyers
Last of the Flight IIA variant Arleigh Burke-class destroyers christened
“Extending these highly-capable, well-maintained destroyers will further bolster our numbers as new construction warships join the Fleet,” said secretary Del Toro. “It also speaks to their enduring role in projecting power globally, and most recently in the Red Sea, their proven ability to defend themselves, as well as our allies, partners and friends from missile and drone attacks.”
Each of the DDG-51 Flight I ships (DDG 51-71), which first entered service between 1991 and 1997, underwent a Navy inspection within the last 10 months. The 12 destroyers chosen for service extension were judged viable beyond their expected service life, though the Navy added that “the final determination of each ship's service life was based on maximizing the service life of each ship before it required another extensive and costly docking availability”.
Admiral Lisa Franchetti, chief of naval operations, said the life extension was in line with her NAVPLAN which directs the Navy to “get more ready players on the field”.
“Today's budget-constrained environment requires the Navy to make prioritised investments to keep more ready players on the field,” Franchetti explained. “The Navy is actively pulling the right levers to maintain and grow its Battle Force Inventory to support the US's global interests in peace and to win decisively in conflict.”
The Navy has not specified which 12 of the 21 Flight I Arleigh Burke-class vessels will have their operational life extended, nor whether there are any plans to similarly sweat the Flight II and IIA vessels in the class. Design and construction of vessels in Flight III of the class began in 2018, with more ordered in both 2019 and 2023. In 2023, however, it approved life extensions for four initial vesselsin the Flight Iclass.
Related Equipment in Defence Insight
Arleigh Burke Class (Flight I)

Share
Recent Chats
Share via email
Future: handle WhatsApp here
Future: handle LinkedIn here
Future: handle Twitter here
SUBMENU HERE
Share via Chat
Copy Link